2009 Bid Results
|
• |
FY08 CDBG
School & Lorraine Street Improvement Project (Village of
Catawba) |
| |
|
Bid Date: |
August 28, 2009 |
Award Amount: |
$ |
|
| |
|
|
Bid
Tabulation |
Awarded
to: |
|
|
|
|
|
• |
2009 County Resurfacing Project |
| |
|
Bid Date: |
July 24, 2009 |
Award Amount: |
$516,036.98 |
|
| |
|
|
Bid Tabulation |
Awarded
to: |
A&B Asphalt Corporation
1780 Enon Road
Springfield, Ohio 45502 |
|
|
|
|
• |
County Road Improvement OPWC
Project |
| |
|
Bid Date: |
June 19, 2009 |
Award Amount: |
$970,283.50 |
|
| |
|
|
Bid
Tabulation |
Awarded
to: |
The Shelly Company
1558
County Road 105
Belle Center, Ohio 43310 |
|
| |
|
Reconstructing
a portion of Old Columbus at Vernon Asbury on a new alignment,
along with pavement repairs and resurfacing on Middle Urbana,
Morris, Vernon Asbury, Rebecca, Lakeview and Chenowith roads. |
|
|
|
• |
Green Meadows Road Reconstruction
Project |
| |
|
Bid Date: |
June 29, 2009 |
Award Amount: |
$471,602.40 |
|
| |
|
|
Bid Tabulation |
Awarded
to: |
A&B Asphalt Corporation
1780 Enon Road
Springfield, Ohio 45502 |
|
| |
|
Infrastructure improvements in the Green Meadows
Subdivision including street reconstruction, curb replacement,
catch basin replacement, and fire hydrant replacements.
|
|
|
|
• |
2009 Pavement Marking |
| |
|
Bid Date: |
June 26, 2009 |
Award Amount: |
$296,467.73 |
| |
|
|
Bid Tabulation |
Awarded
to: |
Oglesby
Construction, Inc.
1600 Toledo Road
Norwalk, Ohio 44857 |
| |
|
Pavement markings for various
locations county wide, including all 306 miles of roadway center line, edge
line, lane line and channel lines. |
|
|
|
• |
Medway Lighting Project Phase 2 |
| |
|
Bid Date: |
June 26, 2009 |
Award Amount: |
$126,820.26 |
| |
|
|
Bid Tabulation |
Awarded
to: |
Capital
Electric Line Builders, Inc.
3178 Encrete Lane
Dayton, Ohio 45401 |
| |
|
|
|
|
|
• |
Chenowith Road CDBG Project
(Harmony Township Project) |
| |
|
Bid Date: |
May 29, 2009 |
Award Amount: |
$62, 681.97 |
| |
|
|
Bid Tabulation |
Awarded
to: |
Pul-Mac Solutions, LLC
2221 Stewart Road
South Charleston, OH 45368 |
| |
|
|
|
|
|
| |
|
The project is to
upgrade the existing drainage system along Chenowith Road. The
improvements consist of 1,150 linear feet of 18 inch storm, 3
catch basins, 1,250 linear feet of ditching, 100 linear feet ~ 8
inch tile with 2 yard drains. |
|
|
|
• |
Pleasant Township OPWC Project
(Pleasant Township Project) |
| |
|
Bid Date: |
May 5, 2009 |
Award Amount: |
$978,522.50 |
| |
|
|
Bid Tabulation |
Awarded
to: |
The Shelly Company
1558
County Road 105
Belle Center, Ohio 43310 |
| |
|
|
|
|
|
| |
|
The project consists of the bituminous base pulverizing and
stabilization of Silvers Road (1.7 miles) and Pleasant Chapel
Road (1.85 miles), with a 2 course asphalt overlay, aggregate
berm and other incidentals. Additionally, the project includes
some partial depth repair, a chip seal and asphalt overlay on
Neer Road (2.5 miles). |
|
|
|
• |
Montego Road OPWC Project
(Moorefield Township Project) |
| |
|
Bid Date: |
February 24, 2009 |
Award Amount: |
$1,156,712.00 |
| |
|
|
Bid Tabulation |
Awarded
to: |
Mainline Road & Bridge
4080 Industrial Lane
Beavercreek, Ohio 45430 |
| |
|
|
|
|
| |
|
Connection of Montego Road
between Middle Urbana Road and Derr Road; Connection of
Midfield Street between Student Road and Montego Road; Turn
lanes on Middle Urbana Road at Montego Road. |
|
|
Please visit